Case story

FLS cuts wear maintenance and increases throughput by 7%

The gyratory crusher at a large copper mine was experiencing decreased liner life over time. This forced the site to change their mantle linings much too frequently – nearly every two weeks. Not only did this increase the cost of wear parts, but each change also required 10 hours of downtime. We were contacted to help provide a solution.